Just B / Lean / Diagnosis

Lean diagnosis from one data capture

The waste calculator, the VSM preparation sheet and the A3 priority matrix on one page, with shared inputs. Plant data produces a waste estimate and value stream metrics, and the three largest wastes are highlighted. The ranked improvement list is sent on request.

The fields start with example values — replace them with your own. The page stores and forwards nothing.

01Waste

Plant profile
k€
k€
people
€/hour
The eight wastes

One question per waste type. Where no measured data exists, a shop-floor estimate is enough.

01Overproduction
Average value of finished goods stock
k€
02Inventory
Average value of raw material and WIP
k€
03Defects
Scrap and rework as a share of production cost
%
04Waiting
Waiting for material, machines and decisions
hours/week
05Motion
Searching, walking and fetching, per person
min/shift
06Transport
Non-value-adding material movement
hours/week
07Overprocessing
Unnecessary operations, duplicate data entry
hours/week
08Unused talent
Annual turnover in production
%/year
Estimated annual waste
—
—realistically addressable in 12 months
—per production employee / year

02Value stream

pcs/day
min/day
StepCycle time (s)Changeover (min)OperatorsAvailability (%)Inventory before (pcs)
Value stream metrics
—
takt time
—lead time
—PCE
—value-adding time
Cycle time against takt

04Diagnosis

Discuss the diagnosis

We send the full waste ranking, the ranked improvement list and the printable diagnosis after reviewing the data you submit. Enter your organisation and contact name and compose the e-mail.

The email opens in your own mail client with the inputs only. Calculated results are not included.

How it is calculated

The waste estimate, takt, lead time, PCE and ranking use the same formulas and assumptions as the standalone tools (22% carrying rate, 48 production weeks, 230 shifts, 150 retraining hours). Impact scores in the improvement list follow the share of each waste: above 30% scores 5, above 20% scores 4, above 10% scores 3, otherwise 2.

This tool is an estimate and a decision aid, not business advice and not an audited calculation.

Just B · info@just-b-ltd.com · Waste calculator · VSM preparation · A3 priority matrix