Just B / Lean / Waste calculator

What the eight wastes cost per year

Eight plant-level inputs estimate the annual cost attributable to the eight Lean wastes, and show which three are worth tackling first.

The fields start with example values — replace them with your own.

01 — Plant baseline
k€
k€
people
€/hour
02 — The eight wastes

One question per waste type. Where no measured data exists, a shop-floor estimate is enough — the order of magnitude matters, not the decimal.

01Overproduction
Average value of finished goods stock
k€
02Inventory
Average value of raw material and work in progress
k€
03Defects
Scrap and rework combined, as a share of production cost
%
04Waiting
Waiting for material, machines and decisions, in total
hours/week
05Motion
Searching, walking and fetching material, per person
minutes/shift
06Transport
Non-value-adding material movement, in total
hours/week
07Overprocessing
Unnecessary operations, duplicate data entry, redundant checks
hours/week
08Unused talent
Annual turnover in production (through the cost of retraining)
%/year
Estimated annual waste
—
—realistically addressable in 12 months
—per production employee / year
Your three largest wastes

We send the full ranking with amounts and the recommended first tool based on the data you submit.

Request a detailed analysis

The estimate above stays on your screen. If you ask, we review the inputs and write back what a half-day waste walk would show in the same areas.

The email opens in your own mail client with the details and input values you entered. You send it; the page forwards nothing.

How to read it

The figure is not lost profit, but the annual spend attributable to waste. Typically 20–40% of it can be removed in the first year, with little or no investment.

The ranking matters more than the absolute number. If the inputs are estimates, so is the total — but the order stays stable even with estimated data.

Inventory cost is derived from the stock values you enter, so raw material and finished goods must be given separately.

How it is calculated

Overproduction = finished goods stock × 22% carrying rate
Inventory      = raw material + WIP × 22%
Defects        = annual production cost × scrap rate
Waiting        = hours/week × 48 weeks × hourly cost
Motion         = people × minutes/shift ÷ 60 × 230 shifts × hourly cost
Transport      = hours/week × 48 weeks × hourly cost
Overprocessing = hours/week × 48 weeks × hourly cost
Unused talent  = people × turnover × 150 retraining hours × hourly cost

Assumptions: 48 production weeks and 230 shifts per year, a 22% annual inventory carrying rate, 150 hours of retraining per leaver. Use fully loaded labour cost (gross pay + contributions + overhead), not net wages. The carrying rate covers tied-up capital, storage, obsolescence and insurance.

This tool is an estimate, not business advice and not an audited calculation. Actual savings depend on implementation maturity, management commitment and the nature of the process.